09-20-2017, 11:30 PM
(This post was last modified: 09-20-2017, 11:32 PM by danbrotherston.)
(09-20-2017, 10:38 PM)Bob_McBob Wrote: What's the deal with the Weber St bridge? The official closure is between Dutton and Albert and the LRT naysayers believe the concrete poured means the system is still being built. Was that supposed to be ready in July?
The Weber St. bridge work is entirely unrelated to the LRT work, it's rehabilitation of a 60 year old bridge that happens to go over a railway which happens to have been re purposed as part of the LRT.
I don't know the timeline on that work, or even why it would involve closing the road....(All of the topside surface reconstruction isn't happening for at least a year or two).