07-24-2017, 04:29 PM
Given this reply about the timeline for completion of a ~3m section, I'd beg to differ!
In all seriousness - they need to properly fill the earth, grade it, flaten it, build the forms, pour the concrete, let it set, remove the forms, backfill the edges and then do whatever other treatment in the area is required.
That's the bare minimum - and all has to be carried out within the confines of the retaining walls on both sides (embankment/bridge sides, and the retaining wall separating the MUT from the road).
In all seriousness - they need to properly fill the earth, grade it, flaten it, build the forms, pour the concrete, let it set, remove the forms, backfill the edges and then do whatever other treatment in the area is required.
That's the bare minimum - and all has to be carried out within the confines of the retaining walls on both sides (embankment/bridge sides, and the retaining wall separating the MUT from the road).