07-24-2017, 03:47 PM
I had asked the project team about something I thought about on the weekend.
Right now, pedestrians are guided through the Grade Separation on the road. The sidewalks look to be weeks away - still bare earth, ungraded, under the tracks and further South toward Victoria.
If the plan is to re-open this to traffic on Friday, where will pedestrians will be accommodated?
Apparently, they're going to fast-track one of the two paths/MUT's through the underpass. I'm curious if this will be possible! The amount of work to be done to pull this off looks too great, but GrandLinq has surprised in the past with big pushes at the last possible moment.
Right now, pedestrians are guided through the Grade Separation on the road. The sidewalks look to be weeks away - still bare earth, ungraded, under the tracks and further South toward Victoria.
If the plan is to re-open this to traffic on Friday, where will pedestrians will be accommodated?
Apparently, they're going to fast-track one of the two paths/MUT's through the underpass. I'm curious if this will be possible! The amount of work to be done to pull this off looks too great, but GrandLinq has surprised in the past with big pushes at the last possible moment.