06-09-2017, 07:41 AM
I think given that the final pavement would already be done if not for some bad weather and that they have done re-work on concrete and curbs in this area already, the final design intent is clear.
The original plans seem to have proper connectivity:
http://rapidtransit.regionofwaterloo.ca/...df#page=23
The original plans seem to have proper connectivity:
http://rapidtransit.regionofwaterloo.ca/...df#page=23
Everyone move to the back of the bus and we all get home faster.