02-01-2017, 11:53 AM
I found the reference, it was myself after talking with Kim Moser at the OMSF open house. She told me it would take two weeks from the time the first LRV was finished to the time it was in to the OMSF partly because it has to switch to the GEXR line.
http://www.waterlooregionconnected.com/s...php?tid=14&pid=29642#pid29642
The other reason to think the 15th is unlikely is the @rideIONrt said themselves that it would be late February (I guess technically the 15th is in the later half of February but I think most would consider that mid-February).
http://www.waterlooregionconnected.com/s...php?tid=14&pid=29642#pid29642
The other reason to think the 15th is unlikely is the @rideIONrt said themselves that it would be late February (I guess technically the 15th is in the later half of February but I think most would consider that mid-February).