11-30-2016, 04:22 PM
(This post was last modified: 11-30-2016, 04:40 PM by Pheidippides.)
Traffic signals at king/William king/willis now operational (the roads were still closed as of 3:20).
They are paving between king street trio and the other building.
It looks like we are stuck with the wooden poles a while longer as they covered the gravel patches with asphalt.
They are paving between king street trio and the other building.
It looks like we are stuck with the wooden poles a while longer as they covered the gravel patches with asphalt.
Everyone move to the back of the bus and we all get home faster.