(11-30-2016, 03:09 PM)kps Wrote:(11-30-2016, 02:50 PM)ijmorlan Wrote: The bus stop locations weren’t part of the plan?
There was a plan?
heheheh
Frankly, for the most part, the planning has been:
0) Functional design plan completed in 2013 with input (but no real control from) GRT
1) Rapid Transit/Grandlinq does what it wants
2) GRT picks up the pieces
GRT knows they've got a bus bay at the Square, but they need to see exactly where GrandLinq has installed all the bus stop posts on King, and verify they're where they need them.