11-21-2016, 05:12 PM
(11-21-2016, 04:46 PM)Rainrider22 Wrote:(11-21-2016, 02:19 PM)Terrible weather boatracer Wrote: Crews have started to string the OCS cable starting at the Conestoga terminal this afternoon.
Terrible weather to be pulling wire....
Wouldn't want to be on top of the lift installing the pulleys and threading the cable, mainly due to the wind out there this afternoon.