11-22-2014, 12:17 PM
Question re: aBRT
The functional design plans have a dedicated aBRT offramp from Highway 8 to Fairway road [link - Plan page 29], yet I haven't seen any construction on this. Did this plan get quietly dropped, or did I miss something?
The functional design plans have a dedicated aBRT offramp from Highway 8 to Fairway road [link - Plan page 29], yet I haven't seen any construction on this. Did this plan get quietly dropped, or did I miss something?