11-01-2016, 08:49 PM
4/4 - Tuesday, November 1, 2016
Foundation slab work for the future Waterloo Town Centre station. That heater is looking a little too eager.
Here's some of the rail work I was mentioning in a previous post; the freight-carrying gauntlet track rails had been unclipped, painted black (?!) and are being re-clipped. Also note the installation of the Anchor Wall tiles here; only the 2nd station in the system to receive them so far.
OMSF.
Foundation slab work for the future Waterloo Town Centre station. That heater is looking a little too eager.
Here's some of the rail work I was mentioning in a previous post; the freight-carrying gauntlet track rails had been unclipped, painted black (?!) and are being re-clipped. Also note the installation of the Anchor Wall tiles here; only the 2nd station in the system to receive them so far.
OMSF.