08-24-2016, 10:42 AM
Lots of activity around future Queen station this morning, but forms are still not at the pourable stage.
The Benton side of the work zone is now getting under way; a big front-end loader was tearing up the asphalt. A small strip remains between fences as a pedestrian path, about where the King crosswalk had been.
The Benton side of the work zone is now getting under way; a big front-end loader was tearing up the asphalt. A small strip remains between fences as a pedestrian path, about where the King crosswalk had been.