08-11-2016, 01:27 PM
Earlier this morning ...
Filling in some remaining gaps on Charles:
EB track has just a wee gap left approaching Bordenn, WB much more so:
The rails are placed between Borden and Ottawa. Rebar grid is also on site:
Someone asked about the pedestrian bridge:
Both curbs now poured on Ottawa, and the surface is properly graded. Now need the curb between the roadway and the embedded track:
Filling in some remaining gaps on Charles:
EB track has just a wee gap left approaching Bordenn, WB much more so:
The rails are placed between Borden and Ottawa. Rebar grid is also on site:
Someone asked about the pedestrian bridge:
Both curbs now poured on Ottawa, and the surface is properly graded. Now need the curb between the roadway and the embedded track: