08-05-2016, 10:45 PM
Grandlink has constructed a fairly elaborate pedestrian crossing around Allen.
The spur line tracks are still disconnected at King. I assume they don't have to have them put back over the weekend.
Road closed sign at Frederick and King. Clearly some discontentment with the construction.