07-17-2016, 11:20 PM
The curved track between Stirling and Kent is looking good!
Some sections still need to be poured, though.
The EB car traffic is now crossing the tracks at Borden, allowing the rest of the EB track to be constructed.
Some sections still need to be poured, though.
The EB car traffic is now crossing the tracks at Borden, allowing the rest of the EB track to be constructed.