That's absolutely fantastic - thank you!
I tried to do this on a much smaller scale (in the facebook link above) and had enough trouble just rotating the one sheet to the correct angle to get the break line to align.
1/2 - Tuesday, July 5
Grade Separation work.
...a little closer.
Track is being laid out through the curve from Francis onto Victoria.
Lots of formwork on the Southbound platform track at Borden.
I tried to do this on a much smaller scale (in the facebook link above) and had enough trouble just rotating the one sheet to the correct angle to get the break line to align.
1/2 - Tuesday, July 5
Grade Separation work.
...a little closer.
Track is being laid out through the curve from Francis onto Victoria.
Lots of formwork on the Southbound platform track at Borden.