05-26-2016, 10:00 AM
I really hope the Region just waits to get all 14 trains before they start service. 30 minute frequency doesn't sound very rapid to me and would be a huge step backwards considering the 200 runs every 10 minutes during Fall/Winter. Maybe, if construction on ION is done by September 2017, they'll run buses along the ION corridor and make all the stops ION will make. This way GRT could still have their network redesign of bus routes that integrate with ION stations for the Fall.