03-06-2016, 10:03 PM
Some more photos just before the TPSS was installed, on our way out of town this morning.
Getting ready for the big lift.
Long way up.
Checking in on our way back, here's the installed TPSS:
The tie dragon was at work today, too, installing more concrete sleepers into and out of the very first permanent track switch. This switch is where freight trains will branch off to Elmira off of the Southbound LRT track. The switch is just off to the right.