02-20-2016, 06:30 PM
By this late afternoon, they'd laid a few more strips of ribbon rail down across the culvert by Waterloo Park.
The wider concrete ties in the foreground are for the crossing of the Laurel Trail toward Father David Bauer drive.
These guys are drilling holes in the side of the old, used track to attach the fish plates on the side. This is all just temporary stuff.
The wider concrete ties in the foreground are for the crossing of the Laurel Trail toward Father David Bauer drive.
These guys are drilling holes in the side of the old, used track to attach the fish plates on the side. This is all just temporary stuff.