12-06-2015, 09:34 PM
With the amount of work that's been done so far, I'm still surprised that the Mill / Ottawa are still hasn't been touched. Sure, there's the gas work on Ottawa, but that doesn't count for much when considering the grand scope of this intersection, being one of the major junction points. I'm just really looking forward to this area being somewhat revitalized!
The pdf of the technical drawings of the Ion route show Eby as no longer being a through street. But everytime I've driven through it this week, the new curbs stop before the intersection. Did plans change? Or will the curbs across the street be laid once Cedar reopens?
The pdf of the technical drawings of the Ion route show Eby as no longer being a through street. But everytime I've driven through it this week, the new curbs stop before the intersection. Did plans change? Or will the curbs across the street be laid once Cedar reopens?