11-17-2015, 10:35 AM
(11-17-2015, 10:17 AM)Waterlooer Wrote: I was on this section on Friday. From Union to Allen was the section believe, that they had CONCRETE curbs on the southbound side/east side of King Street. Temporary asphalt curbs were on the other side of the street only, as well as on both sides between Allen and William. I have photographic evidence if needed
I noticed that too... but photo or it didn't happen