Heh, Belmont, you posted the exact pictures I took earlier and was just about to post!
You can see from the last one though what I was referring to a day or two ago — The one side of Charles is dug down to a much lower grade. Almost 4 feet, I'd say! Still wondering what the reason for this is.
It should be the intersection at Benton Charles, which was scheduled to open next week, but will most likely be the week after. I suppose from the way you've worded it that the track on Borden so far doesn't count.
You can see from the last one though what I was referring to a day or two ago — The one side of Charles is dug down to a much lower grade. Almost 4 feet, I'd say! Still wondering what the reason for this is.
(10-29-2015, 07:44 PM)jamincan Wrote: Does anyone have any idea when the first street running section will be open to traffic, and which section that will be?
It should be the intersection at Benton Charles, which was scheduled to open next week, but will most likely be the week after. I suppose from the way you've worded it that the track on Borden so far doesn't count.