10-27-2015, 07:25 AM
(10-26-2015, 08:35 PM)Section ThirtyOne Wrote: Also, King is heavily potholed along that same stretch due to the weekend rains. Grandlinq would be wise to run the grader down there tomorrow.
Northfield at the rail crossing was also heavily potholed on Saturday when I passed. Traffic slowed to a crawl through the stretch causing what should have been a 2 minute drive to turn into a 15 minute drive.