08-23-2015, 04:22 PM
Sheet 21 from the Region's Functional Design Plans seem to suggest that the single existing freight track will be relocated, and the single Southbound LRT track will run parallel with it, until the Mill/Ottawa intersection. If that's the case, it's very likely that the Southbound LRT track will simply very gradually change elevation until it's flush with the existing freight line.