09-26-2019, 04:09 PM
(09-26-2019, 03:49 PM)Square Wrote:would it be cheaper for them both to go up at the same time instead of renting a mobile crane twice?(09-26-2019, 03:24 PM)ZEBuilder Wrote: I wouldn't think so it's probably a pump truck and cement trucks. It looks like the tower crane base is in place. Crane should be coming soon I would assume.Hopefully both cranes, so when I do my walk downtown I will see all the cranes at once.