12-03-2016, 02:41 PM
(12-02-2016, 10:29 PM)Markster Wrote:(12-02-2016, 08:48 PM)Pheidippides Wrote: Seems like a waste to rebuild this driveway at UW to what it was, when it is only going to be widened in a few months, but I guess that is one of the problems with the P3 contract that changes are so expensive mid-contract:
I don't imagine they'll be changing the railway crossing portion of that, when they build the bus mall.
Well something will have to change because they've promised pedestrian, cycling, and bus connections across the new transit road access and based on how it currently being rebuilt there is room for pedestrians on each side and a regular sized van going each way but there is no way busses can fit through the rebuilt access, especially side-by-side and with the challenging turn angles.
Everyone move to the back of the bus and we all get home faster.