06-16-2017, 12:19 AM
(This post was last modified: 06-16-2017, 12:20 AM by DHLawrence.)
Assuming the current high speed proposal actually gets built, wouldn't the Kitchener Line be electric all the way? Is this being considered in the EA for putting wires up for GO?