03-31-2017, 07:04 PM
(03-31-2017, 05:57 PM)jgsz Wrote:(03-31-2017, 04:47 PM)SammyOES2 Wrote: I think Guelph has problems other than just as a stop, right? Like having a lot of at grade crossings that they'll be unable to remove cheaply?
Can't do a grade separation on Kent St. The tracks go down the middle of the street.
Not easily, no. I have heard bits of a plan (not sure how official) to expropriate the houses on the south side between Glasgow and Dublin; and have the ones beyond Dublin be accessible from Waterloo Avenue only. Then the rails can be shifted slightly southward and movement can be freer, even if they don't actually separate the grade.