05-04-2016, 01:46 PM
(05-04-2016, 01:31 PM)KevinL Wrote: How workable would it be to lower the grade of the rail corridor in the St. Leger/Lancaster area to make road overpasses more feasible?
Probably not at all. The yard, which is the main reason for delays there, is right beside Lancaster.