05-12-2018, 06:10 AM
(05-11-2018, 02:29 PM)urbd Wrote: Ok Phase 3 is fully, 100% intended for Google, even the ground level (as in, there will likely be no ground floor retail). A bridge between Phase 3 and 2/1 is not being considered at all. They want employees to move between buildings by using the street. This comes from people in the design team and from Google.
Where is this coming from? The proposal shows ground floor retail.