(06-18-2019, 05:52 PM)jgsz Wrote: 2019-06-18Since the crane went up progress has sped up by alot. Apparently the road is going to be closed again on the 21 but i don't know if it is for concrete or something like 22 Fredrick since the signs are up between King and Weber.
Some progress has taken place since I've been away. I noticed that there are two depressions in the soil on the Duke Street side and they've poured some concrete close to Saint Peter's Lutheran Church. There are a couple of depressions in the concrete but I don't know if either one is for the elevator.
The depressions in front of the crane are definitely for the elevators. It's where the middle of the tower is.