08-31-2017, 03:47 PM
Student move-ins delayed again, this time for TheHub in Waterloo
I've made a thread to talk about (more generically) the problem of missed September occupancy targets:
http://www.waterlooregionconnected.com/s...p?tid=1025&pid=41324
Quote:Residents of ICON, Columbia One and the K2 buildings all experienced move-in delays, and now so will tenants scheduled to move on Sept. 3 into Towers 7, 8 and 9 at TheHub on 130 Columbia St.
I've made a thread to talk about (more generically) the problem of missed September occupancy targets:
http://www.waterlooregionconnected.com/s...p?tid=1025&pid=41324