In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 9 Vote(s) - 3.67 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Vertikal (471-481 King St E) | 23 & 19 fl | U/C
(01-18-2022, 11:42 AM)TMKM94 Wrote: It's weird, I swear the apartment buildings they built on Fallowfield went up very quickly.

I was thinking the same thing.  It's not like all Drewlo jobs are this slow.

But I also can confirm that I go past this project regularly and there are always areas progressing.  Lately it's the taller tower and the parking garage area behind it along Charles St.  The other tower seems to have stalled completely for the last few months.
Reply


Thanks for the updates! I'm glad they're still working on it. Hopefully they can pick up speed this year and it can finally open by 2037. The progress this has taken in comparison to other projects in the region is glacial...only Barrelyards and Bow/Arrow Lofts took this long.
Reply
Looking through past posts, Drewlo started construction in March 2019, a couple of months after Duke Tower started construction.
Reply
I made a post about this project in July 2021. Since then they have added what appears to be 2 floors to the Madison tower, have done some work on the space between the two towers, and nothing to the Cameron tower.

What’s more, the tower crane above the Cameron tower has been idle since September 2021. If they are renting it, it must be costing them a fortune with nothing to show for it. So much for return on investment.

Since I live around the corner, I can attest to the fact that there appears to be about 10 people working on this project. With approximately 40 stories of buildings to erect, it’s going to take a loooooong time to get to end of job. They are about 25% of the way there after 3 years.

One final thought - I have never seen a more chaotic building site than this. With the delays and chaos and tiny staff, they have a long road ahead of them.
Reply
Would the pace of construction reflect Drewlo's assessment of the local rental market, or is something else at work?
Reply
(01-18-2022, 03:55 PM)Acitta Wrote: Looking through past posts, Drewlo started construction in March 2019, a couple of months after Duke Tower started construction.

They have been paused for at least a year, in two separate stretches.
Reply
(01-18-2022, 05:23 PM)Gubs Wrote: What’s more, the tower crane above the Cameron tower has been idle since September 2021. If they are renting it, it must be costing them a fortune with nothing to show for it. So much for return on investment.

They own the cranes.
Reply


(01-18-2022, 05:48 PM)tomh009 Wrote:
(01-18-2022, 05:23 PM)Gubs Wrote: What’s more, the tower crane above the Cameron tower has been idle since September 2021. If they are renting it, it must be costing them a fortune with nothing to show for it. So much for return on investment.

They own the cranes.

I doubt that makes much difference. They still have the capital tied up in them, not earning money elsewhere.

But presumably there are other reasons why it is not worth it for them to speed up the project.
Reply
(01-18-2022, 05:46 PM)panamaniac Wrote: Would the pace of construction reflect Drewlo's assessment of the local rental market, or is something else at work?

Drewlo has LOADS of cash, they own the cranes and equipment so they can afford to take it slow. Not that it makes sense, but they have no investors, or other factors pushing them to speed up.
Reply
(01-18-2022, 06:06 PM)ijmorlan Wrote:
(01-18-2022, 05:48 PM)tomh009 Wrote: They own the cranes.

I doubt that makes much difference. They still have the capital tied up in them, not earning money elsewhere.

But presumably there are other reasons why it is not worth it for them to speed up the project.

Possibly they can't get enough trades to work on all their active projects (a problem for many construction companies), and this has been determined to be one of the lower-priority ones.
Reply
   

28 Jan. 22. There was some activity but not like other sites. Looks like theyre gearing up though.
Reply
It's like our own little Ryugyong Hotel.
Reply
They were pouring concrete today.
Reply


(01-31-2022, 09:22 PM)Rainrider22 Wrote: They were pouring concrete today.

I think they pour concrete everyday. Just not very much...
Reply
Get a load of this...one 3 axel truck per month at a time.
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 4 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links