Welcome Guest!
In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 9 Vote(s) - 4.33 Average
  • 1
  • 2
  • 3
  • 4
  • 5
General Road and Highway Discussion
Sorry, I meant that restriping at the time of repaving is better than restriping later. Didn't mean to imply that it's as good as properly separated bicycle lanes.
Reply


(05-11-2020, 02:21 PM)tomh009 Wrote: Sorry, I meant that restriping at the time of repaving is better than restriping later. Didn't mean to imply that it's as good as properly separated bicycle lanes.

Sorry, not sure what you mean by segregated, my point is that even if the road isn't being repaved, it should still be restriped as needed, I entirely agree that a road should be striped correctly .... from the factory....so to speak.

The other point I was making was that restriping can look better or worse depending on how well it is done, we've seen some particularly poor jobs.
Reply
       
Reply
I want to say that the Stirling St extension/bridge was built in the mid-1960s. Am I in the ballpark or is my memory failing me?
Reply
(05-11-2020, 05:15 PM)panamaniac Wrote: I want to say that the Stirling St extension/bridge was built in the mid-1960s.  Am I in the ballpark or is my memory failing me?

The bridge was built in 1967. This is 1963 aerial imagery with the eventual location marked.

[Image: jD4yh5O.jpg]
Reply
That's a great source image.

I would have put a 60/70's timeframe on it purely from the design.

It's interesting that the strip of land was left open and the road built later, do you have any idea why that was?
Reply
I don’t know whether it was a factor, but CHCI opened in 1968 and the Stirling bridge provided the access route for the areas “south” of the railway tracks.  It may also have anticipated future expansions of Schneiders and the resulting traffic.

By the way, before the extension was built, what is now Stirling “south” of Mill St was called Shoemaker (Ave iirc).

Also btw, Stirling was spelled “Sterling” until 1942.  No idea why it was changed.
Reply


OK, now where can I find these old aerial shots?
Reply
(05-12-2020, 01:46 PM)tomh009 Wrote: OK, now where can I find these old aerial shots?

I think they are somewhere on UW servers, I can't remember where though.
Reply
The bridge structure was thoroughly redone sometime in the last decade, if I recall. I guess they never got to the actual road either side of it, though.
Reply
(05-12-2020, 01:46 PM)tomh009 Wrote: OK, now where can I find these old aerial shots?

Here: https://lib.uwaterloo.ca/locations/umd/project/

And here is the tile containing Stirling: https://lib.uwaterloo.ca/locations/umd/project/IM5.html

The 1930 one is mucked up, but the 1945 and 1955 images are clearer than the 1963 one.
Reply
Amazing to realize that, as late as the mid-1950s, Shoemaker Lake (Lakeside Park) was out at the farthest edge of town.

Off topic, but those photos also show the strange, undeveloped section of land that is more or less bounded by Mill, Stirling, and the railway tracks. It has been reduced in size over the years, and the Schneiders parking lot/Joy townhouses took a good part of it in recent times, but there's still an undeveloped area in the middle, "south" of the Schneider lands and "west" of Shoemaker Creek. I've always wondered what the story was with that area and how it came to be that the city jumped over it when post-war development came along.
Reply
The 2019 WRPS annual report is now available. Speeding charges continue to plummet. I don't think they list hours of enforcement, but given the two officer per car policy with the lousy radio system, and the distinct lack of policing I've observed as a driver, I sincerely doubt it's because everyone has slowed down.

https://www.wrps.on.ca/en/about-us/annual-reports.aspx

https://kitchener.ctvnews.ca/an-inside-l...-1.4947087

Speeding charges:

2015 - 13,509
2016 - 11,473
2017 - 11,714
2018 - 8,847
2019 - 7,250
Reply


(05-20-2020, 06:50 PM)Bob_McBob Wrote: The 2019 WRPS annual report is now available. Speeding charges continue to plummet. I don't think they list hours of enforcement, but given the two officer per car policy with the lousy radio system, and the distinct lack of policing I've observed as a driver, I sincerely doubt it's because everyone has slowed down.

https://www.wrps.on.ca/en/about-us/annual-reports.aspx

https://kitchener.ctvnews.ca/an-inside-l...-1.4947087

Speeding charges:

2015 - 13,509
2016 - 11,473
2017 - 11,714
2018 - 8,847
2019 - 7,250

Wow, that is shocking. We should plot that against budget.

This sounds like TPS all over again.  What is going on with our roads.
Reply
Not sure if this was posted already, but Highland is finally getting a MUT on both sides to Ira Needles.

Guess that hit-and-run death turned up the pressure. Happy to see it, but a sad state of affairs.
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: KevinL, 10 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links