Welcome Guest!
In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 15 Vote(s) - 3.93 Average
  • 1
  • 2
  • 3
  • 4
  • 5
ION - Waterloo Region's Light Rail Transit
Has the GRH crossover been completed yet?

The northbound ION track through Waterloo Town Square is still missing.
Reply


(12-01-2016, 02:07 PM)Markster Wrote: Has the GRH crossover been completed yet?

The northbound ION track through Waterloo Town Square is still missing.

(11-30-2016, 01:37 PM)Canard Wrote: Well, poop. I'm hearing some rumblings that might indicate that the reason that the Cameron Heights crossover (and KCI) are stalled is because they might have to take a (really big) step backward before moving forward again.

One word: Rebar.
Reply
Just thought of another: Northbound track out of Mill station, around to Ottawa past Mill Street.
Reply
Yeah, I know you posted that, Canard, but I don't know at what state it's currently stalled.  Still lacking any concrete, I presume?
Reply
About half of it's been poured, then they stopped due to a "design revision" on the material for the rebar...

...the rebar which is already under the section embedded in concrete.
Reply
Is that just the section by the crossover?
Reply
(12-01-2016, 12:09 AM)JJTL Wrote: Thanks tomh009! Interesting, I think it ties the blue together from each side nicely - looks more complete. Quick comparo of Tom Galloway's original pic on the left, and tomh009's mock up on the right.

[Image: grey_vs_blue_front.jpg]

Oh yeah, liking it with the extra blue!

Edit:  And thank you very much tomh009!
...K
Reply


(11-28-2016, 07:39 PM)Elmira Guy Wrote: I'd like to know which businesses so I would know which ones not to patronise in the future.

Businesses affected by LRT construction turning to legal arena


http://kitchener.ctvnews.ca/mobile/busin...-1.3180723

The sad thing is that businesses such a Frenzi and Knar Jewelers lasted for most of the construction, and right about now when lots of pedestrian traffic is about to come, they finally closed. I expect this christmas season to be the best ever for Uptown businesses. The place is really inviting with its new configuration.
Reply
(12-01-2016, 07:11 PM)BuildingScout Wrote:
(11-28-2016, 07:39 PM)Elmira Guy Wrote: I'd like to know which businesses so I would know which ones not to patronise in the future.

Businesses affected by LRT construction turning to legal arena


http://kitchener.ctvnews.ca/mobile/busin...-1.3180723

The sad thing is that businesses such a Frenzi and Knar Jewelers lasted for most of the construction, and right about now when lots of pedestrian traffic is about to come, they finally closed. I expect this christmas season to be the best ever for Uptown businesses. The place is really inviting with its new configuration.

I'm pretty sure Frenzi (the haircut place and King & Willis Way) closed shortly before construction started.
Reply
Knarr's closing sale was in May, so they must have decided to close in the first few months of construction.
Reply
Indeed, I thought Frenzi closed this summer, but it was actually a year go. Time flies.
Reply
(12-01-2016, 03:50 PM)timc Wrote: Is that just the section by the crossover?

Correct
Reply
It does suck, but you do want to be sure a structure like the crossover is done right the first time. If something goes amiss and the arrangement gets damaged or warped, you don't want an extended closure of an active line to effect repairs.
Reply


The issue was electrical (grounding stuff), from what I understand.

I'm surprised to see this happening already!

<blockquote class="twitter-tweet" data-lang="en"><p lang="en" dir="ltr">Paving underway at King Wellington. <a href="https://twitter.com/hashtag/wrLRT?src=hash">#wrLRT</a> <a href="https://twitter.com/rideIONrt">@rideIONrt</a> <a href="https://t.co/aLR2o71ABX">pic.twitter.com/aLR2o71ABX</a></p>&mdash; Tom Galloway (@tomjgalloway14) <a href="https://twitter.com/tomjgalloway14/status/804708661327233024">December 2, 2016</a></blockquote>
Reply
Gotta get the pavement done before the asphalt plants close in the next few weeks.
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 28 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links