(08-13-2015, 03:34 PM)Canard Wrote: (08-13-2015, 08:01 AM)chutten Wrote: How d'you mean?
The intersection is too steep for the trains. When I spoke with Engineers about this a few years ago, they said it was one of their biggest headaches, outside of the King grade separation. The entire intersection will be flattened/smoothed out, and Benton heading toward Downtown there is already really, really steep.
You said Borden in your original post. I take it you meant Charles/Benton?
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
08-13-2015, 08:26 PM
(This post was last modified: 08-13-2015, 08:28 PM by Canard.)
Posts: 1,095
Threads: 3
Joined: Aug 2015
Reputation:
58
(08-13-2015, 08:26 PM)Canard Wrote: The final tracks now extend from the OMSF South to just North of Albert McCormic Arena. The Mark 4 looks like it is ready to do some alignment now on this section; I assume they can't progress any further South until the trail crossing at McCormic and the Quiet Place crossing are completed. Once Seagram is done as well, they'll have a full long run of the entire Waterloo Spur that can be completed.
What's left to do at the Quiet Place crossing?
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
(08-13-2015, 09:14 PM)GtwoK Wrote: (08-13-2015, 08:26 PM)Canard Wrote: The final tracks now extend from the OMSF South to just North of Albert McCormic Arena. The Mark 4 looks like it is ready to do some alignment now on this section; I assume they can't progress any further South until the trail crossing at McCormic and the Quiet Place crossing are completed. Once Seagram is done as well, they'll have a full long run of the entire Waterloo Spur that can be completed.
What's left to do at the Quiet Place crossing?
...build it? It's still just old tracks and the old crossing. When they lay the new tracks they'll have to build the pedestrian crossing (think of a mini version of the road crossings). Not a big deal, but it has to be done.
Posts: 1,095
Threads: 3
Joined: Aug 2015
Reputation:
58
(08-13-2015, 09:47 PM)Canard Wrote: (08-13-2015, 09:14 PM)GtwoK Wrote: What's left to do at the Quiet Place crossing?
...build it? It's still just old tracks and the old crossing. When they lay the new tracks they'll have to build the pedestrian crossing (think of a mini version of the road crossings). Not a big deal, but it has to be done.
Agh, damn, I just remember months ago when construction first started, there were blog posts about the Quiet Place crossing being worked on. I had assumed they finished it long ago and moved on, working on the crossings in order from North to South.
Posts: 1,085
Threads: 2
Joined: Aug 2014
Reputation:
31
Think they'll do Erb/Caroline this year? It'll be an obscure detour for traffic - Westmount > University > King maybe?
It'll be more involved as it will mean the wye in the parking lot at Waterloo Town Square will need to be put in place at the same time as with likely most of the re-location of the spur through the parking lot to King as well. Almost makes sense to do it before Caroline re-opens this fall to avoid any bad feelings that may occur by closing it fully again for any length of time.
Posts: 1,095
Threads: 3
Joined: Aug 2015
Reputation:
58
(08-13-2015, 10:26 PM)timio Wrote: Think they'll do Erb/Caroline this year? It'll be an obscure detour for traffic - Westmount > University > King maybe?
It'll be more involved as it will mean the wye in the parking lot at Waterloo Town Square will need to be put in place at the same time as with likely most of the re-location of the spur through the parking lot to King as well. Almost makes sense to do it before Caroline re-opens this fall to avoid any bad feelings that may occur by closing it fully again for any length of time.
I'd imagine they would, but I might just be ignorant. I feel as though the tracks along the spur from Northfield to Laurel Creek should be completely done by mid-September-ish? After that it would make sense to get the Erb / Caroline intersection out of the way to open up traffic again there for the winter.
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
From the ion update that I just received:
Quote:In September, Caroline will be ready for the new LRT track, and work to build the rest of the ION infrastructure (i.e., asphalt, final curbs, sidewalks, poles and the overhead wires that power the train) will begin
Posts: 1,085
Threads: 2
Joined: Aug 2014
Reputation:
31
Lots of other info in there too. Utility work is starting on Northfield and King near Conestoga mall will begin soon. Work on the embankment along Hayward, Courtland and the Hydro Corridor north of Fairway starts soon as well.
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
One year in, one year to go until the heavy construction is just about wrapped up! Hard to believe.
Posts: 2,015
Threads: 11
Joined: Oct 2014
Reputation:
77
Research and Technology station
August 15, 2015
Is that some sort of concrete form?
Everyone move to the back of the bus and we all get home faster.
Posts: 1,085
Threads: 2
Joined: Aug 2014
Reputation:
31
University was being paved as I passed by this afternoon while Seagram was a giant hole. Didn't take long to get into things after closing.
Crews were digging up part of the south sidewalk on Allen. Not sure if it's related to ION, but it's a start.
Posts: 4,407
Threads: 15
Joined: Aug 2014
Reputation:
124
08-14-2015, 10:11 PM
(This post was last modified: 08-15-2015, 12:03 AM by KevinL.)
Got a look at the rail-welding work on Charles this morning.
The finished pieces stretch from a bit below Madison, all the way to nearly Cedar.
Edit: Looking at the markings, each welded piece is 560 feet and there will be 30 of them. That's 5.12 km of track just in this load.
Posts: 516
Threads: 1
Joined: Sep 2014
Reputation:
20
(08-14-2015, 08:16 PM)Pheidippides Wrote: Research and Technology station
August 15, 2015
Is that some sort of concrete form?
What does everyone think the LRT users will call the Research and Technology Station? Users will never stick with that politically motivated name and the too long when your drunk name?
"I'm only going as far as "RTS"?
I get on at the "RT" and off at "Caroline"!
Thoughts on this name mess and the others?
Posts: 6,905
Threads: 32
Joined: Oct 2014
Reputation:
224
(08-14-2015, 10:11 PM)KevinL Wrote: Edit: Looking at the markings, each welded piece is 560 feet and there will be 30 of them. That's 5.12 km of track just in this load.
5.12 km of rail... 2.56 km of track
|