Welcome Guest!
In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 15 Vote(s) - 3.93 Average
  • 1
  • 2
  • 3
  • 4
  • 5
ION - Waterloo Region's Light Rail Transit
Project Agreement - Schedule 35, Appendix A, Section 3 - Burn-In Tests

Quote:3.1 Upon successful completion of the Acceptance Tests, the Vehicle shall start the Burn‐In Test to be conducted by the Region and the Vehicle Supplier, with operational support from Project Co utilizing the Test Track and any other available track.

Sounds to me that they have the option to use more than the test track for burn-in testing.

Quote:3.3 The test shall simulate revenue service, to the extent reasonably possible, and include regular cycling of doors, PA announcements, and automatic passenger announcements, PEI operation, radio communication as well as any other feature normally encountered in revenue service. Such simulation may include manual activation of certain features. In the event that the A, B, and C fault‐free continuous 600 km is not achieved the “burn‐in” will be repeated until the requirement is met.

Since Burn-In only takes place after the Acceptance Tests are completed, and Burn-In is 600km of "simulated revenue service"; seems to me that if more of the line is available or even all the line is available it could (should) be used for burn-in testing. As an engineer, the closer a simulation of real world usage is to real world usage, the better.
Reply
« Next Oldest | Next Newest »



Messages In This Thread
RE: ION - Waterloo Region's Light Rail Transit - by JJTL - 01-10-2018, 12:54 PM
[No subject] - by Spokes - 08-28-2014, 04:16 PM

Forum Jump:


Users browsing this thread: 96 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links