10-30-2015, 11:49 AM
(10-30-2015, 11:31 AM)MidTowner Wrote: I think I missed something. Phase II routing to Cambridge has (as far as I know) used Hespeler for a while. An EA has been done, hasn't it? Ion aBRT has been installed there. Why are we talking about changing the routing?
It's always been a conceptual routing.
An EA for LRT has not been completed, and that's what they're starting in November.
We're talking about routing, because Doug Craig doesn't want it on Water Street in front of Galt Collegiate Institute.