Got a look at the rail-welding work on Charles this morning.
The finished pieces stretch from a bit below Madison, all the way to nearly Cedar.
Edit: Looking at the markings, each welded piece is 560 feet and there will be 30 of them. That's 5.12 km of track just in this load.
The finished pieces stretch from a bit below Madison, all the way to nearly Cedar.
Edit: Looking at the markings, each welded piece is 560 feet and there will be 30 of them. That's 5.12 km of track just in this load.