04-10-2018, 07:56 PM
I think that the first floor is now more or less at street level than the previous render was indicating, which I think is a great thing.
Also that description is saying 24 floors which is different than the original information we had posted. It also is stating the inclusion of a cafe, does that mean that the project will be mixed use?
Also that description is saying 24 floors which is different than the original information we had posted. It also is stating the inclusion of a cafe, does that mean that the project will be mixed use?