11-23-2021, 10:26 AM
(11-16-2021, 04:48 PM)taylortbb Wrote: Looks like the blocks sitting in the Joseph St bike lane are getting used sooner rather than later, seems that work is beginning on the Queen St section.
The retaining wall is in now. But I am mystified as to why they did this. The existing slope was not terrible, and the amount of additional sidewalk (?) width is minimal. So, what was the rationale for this project?