(12-05-2019, 03:50 PM)white_brian Wrote: No signs pointing to an answer for any of those questions.This is the bid document. Here is the link https://canada.constructconnect.com/dcn/...n-park-ltc
- 95,000 sf new construction plus 41,000 sf renovation in two separate phases
- 128 LTC beds in a new five storey addition
- 64 LTC beds in the existing two storey building
- new construction is precast concrete floor slabs on concrete bearing walls with brick veneer, fully sprinklered
- existing construction is wood frame on masonry bearing walls with brick veneer, fully sprinklered