The Ottawa South work from Hoffman to Imperial is in good shape; the bike lanes are almost entirely poured, the base asphalt is in and the second layer can go on soon. The sidewalks are yet to be started, however.
That said, I can see them opening the street for full traffic movements in time for Oktoberfest at the Concordia.