04-25-2019, 11:18 AM
There is a new Regional road project out for bid. It is the South Boundary Road along the south end of Cambridge between Water (Hwy 24) and the new Franklin Blvd extension. It is a 4 lane divided road and will have roundabouts at either end, three eco passages for wildlife and a 3m multiuse trail along its entirety. It will cross Cheese Factory Road over the bridge that was built last year. It will be lit along the whole route and have a speed limit of 70km/h
Documents are here:
https://regionofwaterloo.bidsandtenders....a7396b5eb5
Documents are here:
https://regionofwaterloo.bidsandtenders....a7396b5eb5