10-12-2017, 04:53 PM
(10-12-2017, 04:51 PM)danbrotherston Wrote: The pathway to E5 on the east side of the tracks was actually in the original plan. I have no idea why it wasn't built.
And presumably value-engineered out of existence.
Having a path on the east side would eliminate the desire to walk on the tracks here.
They value-engineered safety away.