04-30-2017, 03:42 PM
2/4 - Sunday, April 30, 2017
A supersized lubricator pump is at Charles/Stirling - the only one I can think of on the whole line. I wondered if it was a 4-output model, or something - but there are only two grease lines coming out of it. There's another two pumps behind me for the other curves.
Concrete work for the access paths at Borden.
Finally got to see the waterjet track cleaner up close!
Does a great job - doesn't the finished rapidway look great when it's not covered in dirt, gravel, and construction garbage?
Platform edge work for the top finishing surfaces has begun at Laurier-Waterloo Park!
A supersized lubricator pump is at Charles/Stirling - the only one I can think of on the whole line. I wondered if it was a 4-output model, or something - but there are only two grease lines coming out of it. There's another two pumps behind me for the other curves.
Concrete work for the access paths at Borden.
Finally got to see the waterjet track cleaner up close!
Does a great job - doesn't the finished rapidway look great when it's not covered in dirt, gravel, and construction garbage?
Platform edge work for the top finishing surfaces has begun at Laurier-Waterloo Park!