04-10-2017, 01:19 PM
I was just looking through the slides from the West Waterloo Transportation Study and saw this graphic:
It references a transitway being built on Fischer-Hallman in 2022-2023 between 7/8 and Columbia. It's unfortunate that the study couldn't have been completed before the recent work on Fischer-Hallman south of 7/8. From the info package for Fischer-Hallman Bleams to Ottawa (7121-1stPCCInfoPackage.pdf)
Has anyone seen any other information on this?
It references a transitway being built on Fischer-Hallman in 2022-2023 between 7/8 and Columbia. It's unfortunate that the study couldn't have been completed before the recent work on Fischer-Hallman south of 7/8. From the info package for Fischer-Hallman Bleams to Ottawa (7121-1stPCCInfoPackage.pdf)
Has anyone seen any other information on this?