12-29-2016, 10:22 AM
At the West end of the facility, we see the MOVIA/FLEXITY high speed test track.
Metrolinx' Pilot FLEXITY Freedom LRV will be stretching its legs along this section, soon!
It's now equipped with both third-rail (for MOVIA) and OCS (for FLEXITY) power supply.
The monorail test track hasn't been used for a while now, with Bombardier's two current projects for this product line well underway.