09-03-2016, 08:53 PM
(09-02-2016, 02:02 PM)danbrotherston Wrote: "day" being the operative word there. Even the family pointed out the most problematic part of this was that it was overnight.
The baseline service schedule shows trains from 5am to midnight, which young family or not, is a large portion of the 24-hour day with disruption. That's not including the overnight freight to and from Elmira.
The original functional design plans called for a noise barrier to be built between Quiet Pl and Bearinger based on noise studies that were done. The new plans also call for noise barriers to be constructed in the text, but not shown in the drawings.
Everyone move to the back of the bus and we all get home faster.