07-21-2016, 10:00 AM
(07-20-2016, 10:30 PM)Waterlooer Wrote: Hmm, if this is north of the freight line crossing King, and this needs to be investigated, I'd hope that it wouldn't effect the main Uptown ION construction south of the fright line.
I'd be more concerned about it affecting the reopening of King Street than I am about the rail construction.