05-20-2016, 10:01 AM
I kind of got from the meeting last night that the only technically possible solution was overpass, stairs + elevator. The ramp blocks the truck access to the loading dock and the underpass can't be designed to the right width because of existing structures and underground utilities. It really felt like they had already made the decision to go with the overpass/stairs/elevator solution, because the other options weren't really possible, given the constraints.